ZETES3 Cooling Water Sea Discharge Project

Total 1.600 meter lenght deepsea dicharge line works up to 22 meter deep at  2 x 700 MW capacity ZETES3 Coal Power Plant Project with 400 mm concrete coated 3200 mm diamater steel pipes

  • Date2016
  • LocationZONGULDAK
  • EmployerEren Enerji Elektrik Üretim A.Ş.